ECDM
Policy statement.
Descriptions of current waste generating processes
Descriptions of current and past practices used to eliminate or reduce the generation of toxic pollutants.
Rationale used behind each goal.
Options that have been considered, that are not economically or technically feasible.
The steps to implementing a Environmentally Conscious Management plan are as follows:
Establish a baseline
Identify Options
Evaluate Options
Implement
Continuously Improve
Establishing a Baseline
This is perhaps the most critical step, and perhaps
Is this Essay helpful? Join now to read this particular paper
and access over 480,000 just like this GET BETTER GRADES
and access over 480,000 just like this GET BETTER GRADES
documenting the return on investment.
Assemble a project team.
Outline project tasks and a schedule.
Make project assignments.
Track schedules and budgets.
Conduct pilot testing.
Complete final design and specifications
Document what has been done.
Obtain necessary permits
Obtain bids for equipment, construction, training.
Contract for equipment and services.
Prepare start-up plans.
Oversee equipment installation.
Certify & start up machinery.
Conduct training.
Complete manuals and "as-built" drawings.
Review performance of equipment, as operating vs. as promised.
Need a custom written paper? Let our professional writers save your time.
